72 The forecasted load for 2026 comes from the California Public Utilities Commission (CPUC) status report for CCAs in 2026. The 2026 forecasted figures are being compared with historical data from the Energy Information Administration (EIA). However, the EIA’s 2025 data is preliminary and is missing data for several CCAsCentral Coast Community Energy, Clean Energy Alliance, Desert Community Energy, Marin Clean Energy, and San Jose Clean Energy. The CPUC did not publish a status report for 2025. For these reasons, the total forecasted load for 2026 is being compared with the actual load from 2024. It should also be noted when vintage forecasted load tends to be slightly higher than historic actual load. The CPUC’s 2026 status report for CCAs and Energy Service Providers (ESPs) can be retrieved from: https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/energy-division/documents/community-choice-aggregation-and-direct-access/2026-cca-and-esp-formation-status-report.pdf
73 California Public Utilities Commission. 2025 California Renewables Portfolio Standard Annual Report. November 2025. Retrieved from: https://www.cpuc.ca.gov/-/media/cpuc-website/industries-and-topics/documents/energy/rps/2025/2025-california-renewables-portfolio-standard-rps-annual-report.pdf
74 Ibid.
75 Ibid.