Note: Excludes decommissioned capacity. Source: California Energy Commission; America Clean Power Association. Analysis by CEC Economics
Highlights
  • California added 31 megawatts (MW) but also retired 60 MW of wind capacity in 2025, resulting in a net decrease of 29 MW in cumulative wind capacity compared to 2024. Cumulative installed wind capacity totaled 6,330 MW in California, a 0.5% decrease from 2023 (6,360 MW).76 On the other hand, the rest of the U.S. added 6,944 MW of wind capacity in 2025, reaching a total U.S. cumulative (excluding California) capacity of 161,055 MW. Total wind capacity has remained largely stagnant in California post pandemic, but it continues to expand in the rest of the U.S. Outside of California, the nascent offshore wind industry was growing (South Fork Wind Farm, a 132 MW offshore wind project off Rhode Island, came online in March 2024) but hostile policies from the Trump Administration have put offshore wind developments into a screeching halt.

76 Annual capacity additions and cumulative capacity may not always add up due to decommissioned, uprated and repowered wind turbines. Wind capacity data for each year is continuously updated as information changes.

Challenge
  • California had the first offshore wind lease sale in December 2022 for floating offshore wind (also the first successful lease sale on the West Coast),77 totaling 373,000 acres off the coast of Morro Bay and Humboldt County. The leases have the potential for 4,500 megawatts (MW) of new offshore wind capacity, enough generation to power 1.5 million homes.78 However, since the Trump administration began in 2025, there have been multiple actions to stop various offshore wind projects. They issued a stop-work order for Revolution Wind, an offshore wind project off the coast of Rhode Island that was 80% complete, on August 22, 2025. However, a federal judge ruled that it could move forward on September 22, 2025.79 In California, the federal government has offered multiple offshore wind companies buyouts to abandon their projects including $765 million to Invenergy to abandon four offshore wind leases, including one off Morro Bay, and $1.22 billion to RWE to abandon offshore wind leases off New York, Louisiana, and California’s Humboldt coast.80, 81

77 There are two types of offshore wind technologies: Fixed bottom offshore wind and floating offshore wind. The existing offshore wind projects that are online (Block Island Wind Farm, Coastal Virginia Offshore Wind pilot project, and South Fork Wind Farm) are all fixed bottom offshore wind projects. Floating offshore wind is less mature than fixed bottom offshore wind.

78 American Clean Power Association. California Floating Offshore Wind. December 11, 2022. Accessed August 15, 2023. Available at: https://cleanpower.org/wp-content/uploads/2022/12/ACP_CA-Floating-Offshore-Wind_221206.pdf

79 “Federal judge lifts Trump administration’s halt of nearly complete offshore wind farm in New England.” Associated Press. September 22, 2025. Available at: https://apnews.com/article/trump-renewable-energy-offshore-wind-revolution-wind-f1cbe85a829e3d5e5496f834bcb617d1

80 Los Angeles Times. “Trump administration pays $765 million to kill more offshore wind projects, including one off California.” June 17, 2026. Available at: https://www.latimes.com/environment/story/2026-06-17/trump-pays-765m-to-kill-offshore-wind-projects-some-in-california

81 Los Angeles Times. “Another offshore wind developer exits California in $1.22-billion deal with Trump administration.” August 6, 2026. Available at: https://www.latimes.com/environment/story/2026-08-06/another-offshore-wind-developer-exits-california-in-1-22-billion-deal-with-trump